Inputs
- Cylinder bore
- Rod diameter
- Stroke length
- Target stroke time
- Working pressure
- Allowed valve pressure drop
- Stroke direction
Valve sizing
Translate cylinder bore, rod, stroke, pressure, direction, target time, and allowed pressure drop into required free-air flow and valve Cv. Enter the application values to calculate four decision-ready outputs and review the governing assumptions before selecting equipment.
Valve sizing
Translate cylinder bore, rod, stroke, pressure, direction, target time, and allowed pressure drop into required free-air flow and valve Cv. Enter the application values to calculate four decision-ready outputs and review the governing assumptions before selecting equipment.
Engineering visual
Upstream pressure drives flow through the valve restriction to downstream pressure. The restriction and pressure drop are shown at the component where they occur.
Calculation reference
Use the displayed relationship to understand how the entered conditions affect the result. Treat the output as a preliminary selection, then verify actual operating conditions, catalog limits, and safety margin.
Engineering guide
Calculate required cv for stroke time for a pneumatic application and compare the result with supplier data.
Enter Cylinder bore, Rod diameter, Stroke length and replace every default with application data.
Run the calculation while keeping pressure, temperature, geometry, and reference states consistent.
Interpret Required valve Cv, Equivalent required Kv, Required standard flow against the supplier datasheet, machine risk, and an appropriate design margin.
Air is treated as an ideal gas and the entered coefficient or geometry must match the supplier's stated reference conditions.
Confirm the entire flow path, including tubing, fittings, manifolds, silencers, and simultaneous valve demand.
Start with measured or supplier-confirmed values for Cylinder bore, Rod diameter, Stroke length, Target stroke time. The calculator updates all outputs together, making it easier to see which assumption controls the preliminary selection.
Required valve Cv, Equivalent required Kv, Required standard flow, Required flow in SCFM answer different parts of the same engineering question. Use the primary result for selection, the secondary values to audit units and margins, and the visible formula to reproduce the calculation in an RFQ worksheet.
Air is treated as an ideal gas and the entered coefficient or geometry must match the supplier's stated reference conditions. Confirm the entire flow path, including tubing, fittings, manifolds, silencers, and simultaneous valve demand. Final approval requires the current manufacturer datasheet and validation under installed conditions.
FAQ