Inputs
- Evacuated volume
- Initial absolute pressure
- Target absolute pressure
- Target evacuation time
- Estimated leakage
- System efficiency
Suction capacity
Estimate required ejector suction flow from evacuated volume, initial and target absolute pressure, target evacuation time, leakage, and efficiency.
Suction capacity
Estimate required ejector suction flow from evacuated volume, initial and target absolute pressure, target evacuation time, leakage, and efficiency.
Engineering visual
The ejector or pump removes gas from a known volume, changing absolute pressure over time while leakage adds gas back into the chamber.
Calculation reference
Results are preliminary estimates. Actual operating conditions, component ratings, and the required safety margin determine whether a component is suitable.
Engineering guide
Estimate required ejector suction flow from evacuated volume, initial and target absolute pressure, target evacuation time, leakage, and efficiency.
Enter Evacuated volume, Initial absolute pressure, Target absolute pressure and replace every default with application data.
Run the calculation while keeping pressure, temperature, geometry, and reference states consistent.
Interpret Required rated suction flow, Ideal evacuation flow, Entered leakage allowance against the supplier datasheet, machine risk, and an appropriate design margin.
Evacuation uses absolute pressure, while holding force uses pressure differential; leakage and surface condition must be tested.
Verify acceleration, load orientation, cup or jaw material, moment limits, and loss-of-vacuum behavior on the machine.
FAQ